| Copy of emergency procedures and any revisions |
R8(3) |
Before commencement of the operation and as soon as practicable after any revisions are made |
- |
| Notification of initial discharge of petroleum vapours or gases requiring flaring |
R11 |
24 hours prior to initial discharge |
Notified in writing |
| Notification of certain events relating to well drilling operations |
R14 |
20 days before the day on which the operation commencesAs soon as practicable after any alteration |
Particulars set out in Schedule 1 (parts 1,2,3 and 4 - as appropriate) |
| Well drilling summary report |
R16 |
Copies of daily records and summary report are supplied as soon as practicable |
Daily record particulars set out in Schedule 2Summary report Particulars set out in Schedule 3 |
| Notification of certain events |
R19 |
As soon as practicable |
- failure in any part of primary pressure containment system of a well- steps the employer proposes to take in order to remedy the failure |
| Safety case |
R22(2) |
All practicable steps ensure copy set at least 2 months prior to construction, operation or abandonment |
|
| Revisions to safety case |
R22(3) |
All practicable steps ensure copy of any revision of safety case is sent to Secretary as soon as practicable after revision is made |
|
| Particulars of verification system |
R26(1)(a) |
Suitable verification scheme detail for approval |
As an alternative to Certificate of Fitness. Must contain particulars set out in Schedule 6 |
| Safety case revision |
R27(d) |
Provide copy of revised safety case as soon as practicable after the revision is made |
|
| Certificate of fitness |
R28(4) |
A copy of the certificate of fitness one month before the commencement of operations |
|